58: Description: FLT from road to 1st drainage crossing. This
section offers impressive views and a powerful sense of exposure.
Concern: While the
design is on the contour, the trail needs to be rebenched
in several locations and could be widened to a 24” standard. It is likely that
users deterred by the narrowness of the tread or suffering from vertigo would
use the parallel trail to the east.
Recommended action: Maintenance: Rebench to 24-36” tread.