55: Description:  Drainage crossing 

Concern: a steep ravine 20’ deep and 30’ across with unstable side slopes. Currently users are scrambling down to the river and then scrambling up the bank on the other side of the drainage. This is leading to erosion from the banks next to the river.

Recommended action:   Maintenance: Construct a bridge 30’ x 4’  with handrails.  A pre-fabricated or site constructed bridge could be used. The proximity of the service road on the north side creates easy access to this site.