• Facebook: wnymba
  • Twitter: wnymba
  • YouTube: wnymbavideo
Trail Work
Updates for Allegany SP trail building this weekend
Written by Jon Sundquist   
Thursday, 18 April 2013 16:22

Getting close!

**UPDATE** TJ from wnymba has cabin details via Jon and will be at the Summit Cabins 1, 2, 3 with keys for anyone coming down tonight. He will be there no later than 7pm. email TJ at This e-mail address is being protected from spambots. You need JavaScript enabled to view it if you are friday night camping.

 

Still don't have the details as to what time cabins open on Friday night.  Will post that soon.  If you get there before I do Friday, don't fret, I'm coming!

WNYMBA provides lunches on Sat. and Sun. and will be grilling up hamburgers and hot dogs (and some sides) for Sat. dinner.  Breakfast will be on your own, although I'll have a coleman stove for people who want to cook up some coffee.

Looks like we are just about full for the cabins!

 

 
Allegany State Park Trail Building Info
Written by Jon Sundquist   
Tuesday, 09 April 2013 21:00

RSVP

Everyone is getting fired up for the new trail construction at Allegany State Park coming later this month.  Here are the details about what is going on:

The project is to build new singletrack off of Ridge Run.  This will be the first (and easiest) of three new trails we have approval for.  The location for this new trail is dictated by the topography, and the only ridge in this area that doesn’t already have a trail on it is a couple of miles out on Ridge Run.  That means doing things a little differently.

Tools: The tools will be transported to near the work area by the park using their off road vehicle.  They will be transported out there Saturday morning, and won’t be coming back until Sunday night.

 
Allegany SP Trail Building is a GO!
Written by Jon Sundquist   
Thursday, 24 January 2013 21:05

Yes, the moment you have all been waiting for - new trail construction at ASP!

We have new trails approved in the Allegany State Park Master Plan.

We are starting construction this April 20 and 21 (special two for one deal).

We are going to start work on the Ridge Run singletrack extenion

JavaScript must be enabled in order for you to use Google Maps.
However, it seems JavaScript is either disabled or not supported by your browser.
To view Google Maps, enable JavaScript by changing your browser options, and then try again.

icon

 

Unlike E-ville, trail building in ASP is more remote, and getting there takes longer from Buffalo (but shorter from Bradford, Olean, and Warren, hint..hint).  So we are going to do something different.

 

  • First, we are meeting earlier - 9 AM!  Yes, you have to get up early.

  • Second, we are driving out to the work area along the XC trails (special permission).  If you arrive late, you can bike out to meet us working.

  • Third, we are working all day.  Because it takes a while to get to where we are working, we will put in some long hours.  We will provide lunch *on the trail*!!  Don't worry, you don't have to stay the whole time if you don't want to.  But if you do leave early, you will miss...

  • Fourth, we are staying overnight in the Summit Cabins!  We have arranged to have two cabins provided by the park in return for our work.  This way we can stay over, have some fun, and get an early start Sunday morning on Day 2.

 

So get ready for some trail building.   This e-mail address is being protected from spambots. You need JavaScript enabled to view it if you have any questions!

 

 
Rain picks wrong day, shows up on NTD
Written by Jon Sundquist   
Sunday, 05 June 2011 21:04

There's a never a good day to rain, and we've had way more than our share lately, but unfortunately it cut short some of the trail construction on National Trails Day this past Saturday.  A little rain never hurt anyone, but lightning sometimes does, so when the skies opened up and the bolts came closer, we decided to be better safe than sorry, rather than stay on the top of a prominent ridge next to some tall trees.

But thanks to the great turnout, we still made some great progress on the Mesa Trail.  We put the knowledge gained from the recent IMBA TCC visit to built some more great bench cut trail.

The cold rain made the NTD feast taste all the better.  Special thanks to Al and Jerrine for cooking up a great pulled pork, chili, and all the fixings lunch for our cold and drenched crew.

This leaves plenty to do to finish the trail.  We may consider scheduling some "hard corps" days in July and August like we used to do back in 1999 and 2000.  These are extra days we schedule on a "what the heck, why not" basis.  Because people usually still show up and great trail gets built!

 
So, you thinking of coming to a trail day...
Written by thom   
Wednesday, 25 May 2011 19:47

So, you are thinking of coming out for a trail day, but you never been and don't want to look too much of a newbie…   Don't worry, here is a crash course.
(some of these items are my thoughts, others may feel differently)

Trail work - if you plan on coming out to do a trail work day, please be prepared, consider the following list.

1. gloves
2. work boots if possible
3. long pants,(really recommended) long sleeved shirt (bugs, prickers…)
4. snack and drink
5. bug spray
6. sun glasses, safety glasses
if you wear contacts, bring a case and fluid just in case
7. a pleasant attitude

You may think wearing shorts and gym shoes are best, but these may limit the type of work you will be able to do. Biking shoes with cleats can get easily ruined by shoveling a few buckets of dirt.  Many people wear shorts and shirts, but this is my list... so I'd suggest long pants, workboots.

THE TOOLS

The tools - if you don't know how to use them, ask… but here is a rather quick summary,and please watch and ask.  Be aware of the tools "circle of death"  the area around you that someone may get injured. It covers a few feet beyond the full reach of your arm with the tool in hand.  And Always ask permission before wanting to walk past another trail worker along the worksite.

McLeod- long handled tool for shaping tread, clearing out the organic matter to get down to the mineral soil. Has fingers on one side and usually a sharpened end on the other.  This should never be swung overhead.  This tool is very dangerous to user and nearby people. It is very capable, but can also be tiring if using for several hours.  Watch an experienced user to get the tips on it's use. The handle since it is round, is not for prying things up.


 
<< Start < Prev 1 2 3 4 Next > End >>

Page 4 of 4

Loading feeds...

Our insurance company has "strongly suggested" that we tell you that Mountain Biking can be dangerous. If you're visiting this site it's very likely that you're already aware that if you insist on having a good time by riding your mountain bike, eventually you will almost certainly fall down and collect any number of boo-boos, dings and injuries, serious or otherwise, but we have to tell you anyway.

Mountain Biking is a potentially hazardous activity carrying a significant risk of bodily injury and even death. Mountain biking should only be undertaken if you have a complete awareness of these risks. You can reduce the level of risk by wearing a helmet and by riding within your own skill level.