More recent Bond Lake news
With the original proposals for Bond Lake work dying due to bureaucracy, a WNYMBA member who is an attorney offered to develop a Memorandum of Understanding (MOU) to offer as an alternative to the Contract that the county legal folks wanted signed. This was drafted up in 2009. However, with the original champions of the project out of the picture, the original plans for the trails were no longer available and were lost.
In early 2010, the plans were found in a bunch of grainy scans, and at the same time, Brandon S. and Dave K. stepped up to try to push this project forward. They scouted out the proposed route of the first new trail, and developed the red GPS track below:
The blue tracks are possible future expansions.
Based on this scouting, and the MOU developed pro bono by the attorney, this proposal was submitted in May 2010:
Proposed MOU and Trail Proposal